جاهز للتشغيل
جاهز للتشغيل
The Egyptian Ministry of Petroleum has denied the accuracy of reports circulating on social media regarding Egypt bearing a $50 million cost to repair the "Energos Winter" drilling ship at the Damietta port. The ministry clarified that this information is incorrect and not based on official sources. It also confirmed that statements made by Egas officials did not include any reference to repair costs, and that the published allegations are unreliable and constitute misleading information. The ministry indicated that it reserves its legal right to take appropriate action against the dissemination of these false claims, and called on citizens to verify official data and not to be swayed by unverified news.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading