8 Hrs
المصدر:
البيان
البيان
جاهز للتشغيل
جاهز للتشغيل
In June, Dubai Municipality revealed that it had identified more than 1,385 engineering and technical violations at construction sites, resulting from non-compliance with engineering regulations and structural safety standards. The municipality carried out 6,887 inspection visits to oversee projects covering nearly 44 million square meters, responding swiftly to 767 reports to ensure violations were rectified. Additionally, the amount of ready-mixed concrete supplied to projects reached 336,210 cubic meters, with an emphasis on adhering to safety and quality standards to promote a safe and sustainable urban environment in Dubai.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading