اقتصاد
اقتصاد
جاهز للتشغيل
جاهز للتشغيل
The Syrian Petroleum Company has announced that it has restored the Jbeisa gas pipeline in Deir Ezzor Governorate to service after repairing damages caused by sabotage in the Shoula area in southern Deir Ezzor. The pipeline, which transports approximately 950,000 cubic meters of gas daily from the Jbeisa fields to the Furat Gas Plant, was targeted on September 28 by sabotage that resulted in an explosion of the sectional valve. During the repair, an affected 18-meter segment was replaced, helping to ensure the continuity of gas supplies and support operational activities in the region, especially since the Jbeisa fields are among the largest sources of local gas. Additionally, the gas sector in Syria faces ongoing targeting of critical infrastructure, with repeated acts of sabotage since August, posing a threat to the stability of the country's energy supplies.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading