15 Hrs
المصدر:
نداء الوطن
نداء الوطن
جاهز للتشغيل
جاهز للتشغيل
The Ministry of Public Works and Transport is working on constructing a temporary passage at the damaged Qaqaa’iya Bridge in southern Lebanon, with the aim of restoring traffic flow over it. Currently, forms are being installed on a temporary ferry, allowing cars to cross the Litani River. The bridge is a main hub connecting Nabatieh and Bint Jbeil districts, playing a significant role in the local road network to facilitate residents' mobility and maintain connections between areas. The ministry continues to monitor the work until the project is completed, as part of efforts to rehabilitate damaged roads and bridges.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading