24 Hrs
المصدر:
Lebanese Forces
Lebanese Forces
جاهز للتشغيل
جاهز للتشغيل
The Beirut and Mount Lebanon Water Authority will shut off water supply on the main pumping line extending from the Ibrahim River to Jbeil, as part of a project to contain water loss. This will result in a water outage in the area starting this morning.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading