قناة الجديد
قناة الجديد
جاهز للتشغيل
جاهز للتشغيل
The article discussed a new batch of projects for the Beirut and Mount Lebanon Water Establishment, announced following a visit by the Minister of Energy and Water, Jou Saadeh. It emphasizes the importance of strengthening water infrastructure and improving supply quality through the implementation of projects such as rehabilitating the water network from Jeita to the Zouk Mikael station, taking over the Jeita wastewater treatment plant, as well as projects to connect regional wastewater networks. The information also includes details about international funding, such as a loan from the German Development Bank and support from the French Development Agency, along with plans to activate smart meter management and enhance water and wastewater services, aiming to reduce waste and better meet the needs of the population.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading