7 Hrs
المصدر:
LBCI Lebanon
LBCI Lebanon
جاهز للتشغيل
جاهز للتشغيل
The Ministry of Public Works and Transport has opened a temporary passage at the Qaqaa'iya Bridge over the Litani River, aimed at reestablishing the connection between Nabatieh and Bint Jbeil after the bridge was destroyed due to attacks. A ferry has been set up, along with embankments and paved roads, allowing traffic to resume through this vital point. Safety measures and preparatory steps, including clear signage and markings, will be completed within 15 days to ensure the road's safety, thereby facilitating easier movement between the southern regions.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading