دايلي بيروت
دايلي بيروت
جاهز للتشغيل
جاهز للتشغيل
The Sidon Municipality issued a statement regarding the regulations and costs for electrical subscriptions for September 2026. The rates will adhere to the Ministry of Energy and Water's tariff from August, which is 52,840 L.L. per kilowatt-hour. This is conditioned on a minimum of 12 hours of generator feeding daily, increasing to 61,000 L.L. if feeding exceeds 17 hours. The fixed subscription fee is determined based on capacity (385,000 L.L. for 5 amperes and 685,000 L.L. for 10 amperes, with an additional 300,000 L.L. for each extra 5 amperes). For elevators and three-phase shared sections, the fixed charge is calculated based on the capacity of a single phase. The municipality emphasized the need for the invoice to include all details and to provide a three-month notice for permanent service termination. It also warned against imposing any illegal additional taxes or fees on the tariff, including unauthorized taxes, maintenance charges, or fees on solar energy systems.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading