16 Hrs
المصدر:
الشروق التونسية
الشروق التونسية
جاهز للتشغيل
جاهز للتشغيل
The interruption and fluctuation in the distribution of potable water in the Ben Arous and Menzel Bourguiba areas were caused by essential repair works on the main canal with a diameter of 1250 mm, which started on Thursday morning, September 10, 2026. Water distribution is expected to gradually resume starting from 6 p.m. after the repairs are completed, which will continue throughout the day.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading