23 Hrs
المصدر:
الشروق التونسية
الشروق التونسية
جاهز للتشغيل
جاهز للتشغيل
The Ministry of Equipment and Housing announced the closure of Local Road No. 457, connecting Tunis and Mghira at the Saint-Gobain Bridge, on September 20 and 21, 2026, from 10:00 PM to 4:00 AM. This is to carry out expansion works on the southern entrance to the capital. The ministry confirmed that alternative routes such as Moncef Bey Street, Bab Alioua Bridge, and National Road No. 1 can be used for passage, while also urging drivers to exercise caution and obey traffic signals.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading