جاهز للتشغيل
جاهز للتشغيل
The Qarqana article focused on the efforts made by the municipality in preparation for the rainy season. It highlighted intensified field interventions, including opening and cleaning the rainwater drainage network, removing dirt and obstacles, addressing water puddles, and preventing blockages in the drainage channels caused by accumulated waste. The measures also involved cleaning around institutions and reopening roads that were closed due to flooding, all aimed at restoring normal traffic flow and enhancing infrastructure readiness to handle weather fluctuations during the autumn season.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading