جاهز للتشغيل
جاهز للتشغيل
The inauguration of the high-voltage power transformation station in El Kef, with an approximate cost of 20 million Tunisian dinars, aims to improve the quality and reliability of electricity supply to the region. The station is located in Wadi Raml and connects the city of El Kef to Tajrouine and Jendouba stations via advanced overhead lines. It includes two main transformers, each with a capacity of 40 megavolt-amperes. The station was put into operation this year despite contractual challenges, and it represents a significant addition to supporting investment and economic development in El Kef Governorate.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading