22 Hrs
المصدر:
الشروق التونسية
الشروق التونسية
جاهز للتشغيل
جاهز للتشغيل
Libya resumed oil pumping today through the Sharara-Zawiya pipeline after it was shut down due to an issue with valve number 7. The closure resulted in a loss of approximately 130,000 barrels per day over four days, leading to financial losses exceeding $75 million. This crisis caused a significant decrease in production at one of Libya's largest oil fields, with warnings of further losses if the flow remains halted.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading