1 Day
المصدر:
الشرق الأوسط
الشرق الأوسط
جاهز للتشغيل
جاهز للتشغيل
Production operations in three oil fields in Libya have halted after a group of oil facility guards unlawfully shut off the main shipping line valve between Hamada and Zawia. The National Oil Corporation stated that a force majeure could be declared if the shutdown continues or if other fields are subjected to forced closures, noting that production has repeatedly been interrupted for political and technical reasons since 2011.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading