معلومات مباشر
معلومات مباشر
جاهز للتشغيل
جاهز للتشغيل
Alstom has signed four contracts, in partnership with Ruwad for Modern Engineering and Konkrete Plus, with a total value of up to 690 million euros. These contracts aim to upgrade strategic sections of the Egyptian railway network, including the Sixth of October – Alexandria line and the Bulaq – 10th of Ramadan line. The projects involve updating digital systems, improving communication networks, and enhancing power supplies, all with the goal of increasing safety, boosting capacity, and reducing travel time by approximately 80 minutes on the main corridor. These initiatives support Egypt’s Vision 2030 objectives and contribute to the development of the national transportation and logistics network.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading