67 Days
Source:
AL24 News
AL24 News
Ready to play
Ready to play
The Sonelgas Algerian complex has announced the commissioning of a gas pressure reduction station in the Tomyat area of Bechar Province, aimed at ensuring a regular and safe supply of natural gas for the iron ore exploitation project at Gara Gblat Mine in Tindouf Province. The station connects a 28-inch diameter pipeline with a flow capacity of 15,000 cubic meters per hour, and has been built according to the highest technical standards to enhance the energy supply for the project and achieve its production goals. This achievement underlines Sonelgas teams' ability to complete strategic projects within the designated timeframes.
Notice: This Is an AI-Generated Summary
Comments (0)