النهار أونلاين
النهار أونلاين
Ready to play
Ready to play
The article focused on the visit of the Minister of Water Resources, Al-Wenass Bouzagga, to Biskra Province to follow up on water sector projects, especially the project to rehabilitate the potable water supply system. The progress of the works was reviewed, including the renewal of water distribution pipes extending 23.804 km, the completion of 705 individual connections, and the installation of meters, all aiming to eliminate leaks, improve service quality, and ensure continuity, with the network's efficiency improving from 41% to 87%. Additionally, the commissioning of a 1,000 cubic meter water tank to enhance storage capacity and improve water supply to the region was overseen. The minister emphasized the importance of completing projects on time, with a focus on reducing water losses and ongoing network rehabilitation, to ensure the optimal use of water resources.
Notice: This Is an AI-Generated Summary
Comments (0)