23 Hrs
Source:
الجمهورية
الجمهورية
Ready to play
Ready to play
A partial and alternating closure of the highway tunnel leading to the Oran port will be carried out from September 28 to October 9, 2026, in order to conduct tests on the centralized management systems and equipment maintenance. The period will include the closure of the first tunnel at Canastel from September 28 to 30, followed by the second tunnel (the covered trench) from October 1 to 6, with traffic diverted to the opposite side. Authorities warn drivers to exercise caution and adhere to traffic signals during the work period.
Notice: This Is an AI-Generated Summary
Comments (0)