النهار أونلاين
النهار أونلاين
Ready to play
Ready to play
A report states that Minister of Public Works and Basic Infrastructure, Abdelkader Jlaoui, State Minister and Minister of Hydrocarbons, Mohamed Arkab, and Minister of Mines, Mourad Hanifi, conducted an on-site inspection to monitor the progress of the Eastern Mining Line between Annaba and Tébessa. The visit involved reviewing the stages of laying the layers and preparing the bridges at the two kilometer points 25 and 26. Currently, the work is nearing completion on the two bridges, which are 550 and 750 meters long, with heights reaching 42 and 32 meters, and have been constructed by national specialized companies. The plans include delivering the project as soon as possible after completing technical tests, as part of efforts to improve rail routes and strengthen industrial facilities in the region.
Notice: This Is an AI-Generated Summary
Comments (0)