Ready to play
Ready to play
The Minister of Water Resources, Lounas Bouzguiza, confirmed that the partial repair of the main canal in Boudaou has led to a gradual return of water supply to the residents of Boumerdes and the capital city with potable water. Following soil slippage and the resulting damage, emergency technical solutions were implemented to ensure continuous service, including connecting affected areas through the "Ben Rahmoun" station and temporarily redirecting water supplies to the Hadara Dam as a strategic option. The minister praised the efforts of the technical teams and private companies that worked tirelessly, and extended his gratitude to the local residents for their patience and understanding. Water supply has begun to be restored gradually after being disrupted for between three and four days.
Notice: This Is an AI-Generated Summary
Comments (0)