الجمهورية
الجمهورية
Ready to play
Ready to play
Gouaine, Wali of Sidi Bel Abbes, Kamel Haji, inspected the double-track project of National Road 13 between Sidi Bel Abbes and Talagh, spanning 43 km. He reviewed the progress of work on the section connecting Lweza Village and Tighalimt (4.2 km), as well as the section between Tighalimt and Talagh (9 km). He ordered the acceleration of work pace and the assurance of quality, with support for the construction sites through material and human resources, aiming to complete the project within the scheduled deadlines. Additionally, the contract for part of the work that did not comply with execution conditions has been terminated, and work is currently being resumed by a new company. Lighting has also been installed at the roundabout intersections between Bouloudi and Lweza to ensure safe traffic flow at night.
Notice: This Is an AI-Generated Summary
Comments (0)