1 Day
Source:
الجمهورية
الجمهورية
Ready to play
Ready to play
The tunnels of the motorway leading to the Port of Oran have been reopened after the successful completion of central system management tests and equipment maintenance at 100%. The Algerian Motorways Team conducted tests on the management systems, ensuring their readiness, in addition to maintaining the three fans inside the tunnels and conducting load tests on the giant bridge. The testing operations began on September 28 and included partial closures and rotations, concluding 24 hours ahead of schedule.
Notice: This Is an AI-Generated Summary
Comments (0)