المساء
Source: المساء
Recentlyالمساء
Source: المساء
RecentlyReady to play
Ready to play
Public Works and Basic Infrastructure Minister Abdelkader Djellaoui stressed the need to maintain mobilization and coordination to complete the expansion of the Annaba phosphate port and deliver it on schedule. He expressed satisfaction with the progress of the works during an inspection visit to Annaba Province. The mining quay includes a 1,600-metre structure. Of the 1,322 piles planned, 1,180 have been driven, while marine dredging has reached 11 million cubic metres out of a planned 13 million. Djellaoui praised the pace of work after a second specialised vessel was added to the project. Reclamation work and construction of the breakwater to protect the port are also continuing.
Notice: This Is an AI-Generated Summary
Comments (0)