Ready to play
Ready to play
The Wilaya of Boumerdes is preparing for the summer season by increasing water production by 55,000 cubic meters daily, following the repair of over 2,000 leakage points to recover lost water and improve the distribution of drinking water to become daily in some areas. Development projects have also been launched to enhance water stability, ensuring a regular and rapid distribution. Additionally, the region has seen an increase in grain production to over 5,400 tons, thanks to improved rainfall and preventive measures to ensure the quality of the crops.
Notice: This Is an AI-Generated Summary
Comments (0)