3 Days
Source:
The Boston Globe
Source: The Boston Globe
3 DaysThe Boston Globe
Source: The Boston Globe
3 DaysReady to play
Ready to play
Cambridge’s Linear Park, a key path between Davis Square and Alewife, has been closed since October 2025 for a major renovation and is expected to reopen by the end of December, with other construction continuing into 2027. The work includes upgrades beyond repaving, while crews use slower excavation methods to protect existing trees. The construction contract is valued at $7.88 million.
Notice: This Is an AI-Generated Summary
Comments (0)