3 Hrs
Source:
BBC Home
BBC Home
Ready to play
Ready to play
Ukraine’s seven-stage operation culminated in missile and drone strikes on the Crimean Bridge in the early hours of 17 November, collapsing its main road arch into the Kerch Strait. The railway arch remained standing and trains later resumed, but a structural engineer described the damage to the road span as catastrophic, with full road traffic potentially taking over a year to restore. The collapse raises the risk of a transport and supply crisis in Crimea, where alternative land and ferry routes are limited and vulnerable to attack.
Notice: This Is an AI-Generated Summary
Comments (0)