1 Day
Source:
معلومات مباشر
معلومات مباشر
Ready to play
Ready to play
The Kuwait Ministry of Electricity, Water, and Renewable Energy announced that the power has been fully restored to the Shuwaikh area after a brief outage caused by the failure of three 33-kilovolt transformers due to a technical malfunction resulting from high temperatures and increased loads. The service has been completely restored in Section 6 of the area.
Notice: This Is an AI-Generated Summary
Comments (0)