Ready to play
Ready to play
The development project for Oud Metha Street and Al Asayel Street in Dubai aims to improve traffic flow and accommodate population growth. A major bridge has been opened, and two new tunnels are scheduled to be completed by August, along with several intersection bridges. The project increases capacity from 10,400 to 15,600 vehicles per hour, representing an increase of up to 50%. It also reduces travel time from 20 minutes to 5 minutes, achieving an improvement of up to 75%. The project includes the development of four main intersections, infrastructure such as bridges and tunnel systems, serving neighboring residents estimated at 420,000 people by 2030. The goal is to ease traffic congestion and enhance mobility flow.
Notice: This Is an AI-Generated Summary
Comments (0)