البيان
البيان
Ready to play
Ready to play
The development of the Dubai Electricity and Water Authority features a unified and digitally optimized design for 132-kilovolt power transmission stations. This aims to enhance the efficiency and flexibility of Dubai's electrical grid and to keep pace with the increasing demand for electricity. This digital approach contributed to reducing the design and construction timeline by over two months and lowered the station's cost by nearly one million dirhams. Additionally, it helped decrease energy consumption and carbon emissions. The initiative also improved project management, standardized engineering and technical specifications, and saved annual resources for water and energy. Moreover, it enabled the adoption of Fourth Industrial Revolution technologies such as artificial intelligence and the Internet of Things, to strengthen the future readiness of the electrical grid.
Notice: This Is an AI-Generated Summary
Comments (0)