Ready to play
Ready to play
During the current year, the General Authority of Roads completed 80 projects for the maintenance of the road network, including addressing damages and enhancing efficiency through improvements to roads, bridges, culverts, and intersections, at a cost of approximately 4 billion Riyals over the past three years. The authority employs modern techniques such as on-site recycling equipment for pavement layers, which has increased cost efficiency by 44% and reduced the consumption of new materials. Additionally, surveys and assessments have been carried out covering more than 215,800 kilometers of asphalt roads and 15,000 kilometers for skid resistance measurement. The goal is to build an accurate database that contributes to better prioritization and improved service levels, with the implementation of Saudi Road Code standards beginning in 2025 to enhance the network quality and user safety.
Notice: This Is an AI-Generated Summary
Comments (0)