9 Hrs
Source:
الموجز
Source: الموجز
9 Hrsالموجز
Source: الموجز
9 HrsReady to play
Ready to play
The Meter Department at the Electrical Engineering Department of Tahrir has affirmed that the coded meter system is implemented in illegal buildings to regulate electricity connections and maintain grid stability, not to punish citizens. This system allows residents to obtain legal electricity supply, with actual consumption being accurately recorded. It is a temporary measure until building conditions are legalized and reconciliation procedures are completed. Additionally, it warns that connecting electricity to unlicensed buildings without proper controls could lead to increased random construction and negatively impact the infrastructure.
Notice: This Is an AI-Generated Summary
Comments (0)