Ready to play
Ready to play
Transferring electricity meters without the permission of the distribution company is subject to legal and administrative accountability, as it constitutes a violation of the governing regulations. The meter should only be moved by authorized technical teams after submitting an official request and paying the applicable fees, to ensure accurate readings and safe connections. Any illegal transfer may result in the discontinuation of service for the meter, and the subscriber may be held responsible for inspection and reinstallation costs. They may also face accountability if tampering or manipulation is detected. Such unauthorized actions complicate technical work and jeopardize the accuracy of electricity consumption measurement.
Notice: This Is an AI-Generated Summary
Comments (0)