Ready to play
Ready to play
The Nuclear Power Plants Authority for Electricity Generation has confirmed that the installation process of the second reactor pressure vessel at the Dabaa Nuclear Power Station was carried out in accordance with the highest international safety standards. It also stated that circulating concerns on social media regarding safety violations are not accurate. The authority pointed out that the assessment of compliance with safety standards is based on technical documents and risk assessment plans, not just on video footage. Additionally, it clarified that the use of technical teams to guide heavy equipment during installation—performed by trained personnel—is a globally followed engineering procedure that reflects compliance with international practices, including experiences from other nuclear projects worldwide. The authority noted that the Director General of the International Atomic Energy Agency attended the installation process and praised its precision, affirming that no safety concerns were raised. The process was completed within the scheduled timeline without incidents. Finally, the authority emphasized its commitment to the highest standards of nuclear quality and safety, and called on media outlets and social media users to rely on official sources and avoid sharing unverified information.
Notice: This Is an AI-Generated Summary
Comments (0)