المصري اليوم
المصري اليوم
Ready to play
Ready to play
The Alexandria Metro Project aims to improve the city's mass transportation system, with trial operation of the first phase expected to begin in March 2027. The project involves converting the Abu Qir railway line into a modern electric metro, spanning 21.7 kilometers with 20 stations—6 at surface level and 14 elevated. Its goal is to increase capacity from 2,850 passengers per hour to 60,000, reduce travel time from 50 to 25 minutes, raise operating speed from 25 to 100 km/h, and decrease train frequency from 10 minutes to two and a half minutes. The trains are manufactured domestically in Egypt, and it is anticipated that this will mark a significant leap forward in Alexandria’s transportation services.
Notice: This Is an AI-Generated Summary
Comments (0)