Ready to play
Ready to play
The Egyptian Ministry of Electricity and Renewable Energy confirmed that the national power grid is operating efficiently and stably during the current heatwave, without the need for load shedding or power cuts. Despite temperatures rising to approximately 38.8 gigawatts and demand expected to exceed 39 gigawatts, the system is capable of accommodating the increase, with continuous monitoring around the clock to ensure stable electrical supply. Officials also noted that the sector's investments over the past ten years have totaled 4.15 trillion Egyptian pounds, and an emergency plan has been activated to handle the increased loads, in coordination with the Ministry of Petroleum to ensure fuel supplies for power plants.
Notice: This Is an AI-Generated Summary
Comments (0)