اليوم السابع
اليوم السابع
Ready to play
Ready to play
The article discusses the expansions and improvements of the Arba Al-Zeina Water Station in Samalout Center, Minya Governorate, which is one of the largest water stations in the governorate. Situated on a 18-acre area, it serves more than 844,000 citizens and operates with a rapid filtration system capable of processing up to 1,600 liters per second through two lines for raw water and one line for treated water. The project was implemented in two phases in 2010 and 2022, aimed at providing clean water that complies with health standards. Additionally, the project included the construction of a sewage network connecting the city to the station, with 1,100 household connections underway at a cost of 4.5 million Egyptian pounds, expected to be completed within three months. These projects are part of the state's efforts to improve water and sewage services and meet the needs of the population in Upper Egypt, with ongoing follow-up to ensure quality and efficiency.
Notice: This Is an AI-Generated Summary
Comments (0)