Ready to play
Ready to play
The article discusses the efforts of the Ministry of Electricity and Renewable Energy to eliminate the system of coded meters and convert them into official, legal meters. The deadline for inspecting the applications submitted by citizens has expired. It was reported that technical committees have achieved a significant percentage of inspections; however, some informal areas with high population density require additional time to complete the examinations, in coordination with the Electricity Police. To convert a meter from coded to legal, submission of documents proving settlement is required, such as certificates for connecting official utilities and settlement forms. It is also possible to inquire about the legal status of properties through official channels. These procedures are part of a comprehensive plan to transition fully to pre-paid meters, including imposing fines on late adopters and waiving the estimated consumption charge, with the aim of legalizing the situation and reducing electricity theft.
Notice: This Is an AI-Generated Summary
Comments (0)