1 Day
السويس بلدي
Source:

السويس بلدي

2026-07-25T12:58:43.000Z

Most Read

Prosecutor seeks probe in Al-Umraniya hanging

فيتوفيتوفيتو
23 Hrs2026-07-25T21:13:36.000Z
Prosecutor seeks probe in Al-Umraniya hanging

Port Said defendants arrested for weapon assault

الوطنالوطنالوطن
23 Hrs2026-07-25T20:52:42.000Z
Port Said defendants arrested for weapon assault

Iran Sustains Missile Capabilities and Regional Tensions

الوطنالوطنالوطن
23 Hrs2026-07-25T20:47:41.000Z
Iran Sustains Missile Capabilities and Regional Tensions

Three suspects detained for Red Sea fraud group

بوابة الشروقبوابة الشروقبوابة الشروق
23 Hrs2026-07-25T20:33:31.000Z
Three suspects detained for Red Sea fraud group

Suspects in Port Said blade attack detained

بوابة الشروقبوابة الشروقبوابة الشروق
23 Hrs2026-07-25T20:31:45.000Z
Suspects in Port Said blade attack detained
السويس بلدي

Source: السويس بلدي

1 Day
Jarayid.com
Follow Us
Jarayid.com

Smart Reader

Ready to play

Smart Reader

Ready to play

Transport Minister reviews BRT Phase Two Readiness

Transport Minister reviews BRT Phase Two Readiness

The article focused on the follow-up and inspection conducted by the Egyptian Ministry of Transport regarding the development and expansion project of the Ring Road around Greater Cairo, especially the second phase of the Bus Rapid Transit (BRT) project. Minister Kamel El-Wazir carried out an inspection tour to assess the readiness of the stations and their accompanying services, which extend over 40 kilometers and include 16 stations out of a total of 48 stations across the three phases. The minister emphasized the readiness of the operational teams and their preparedness to launch the second phase, highlighting efforts to improve service quality. He pointed out that the project reflects a move towards sustainable and environmentally friendly mass transit using modern electric buses. Additionally, he stressed the importance of enhancing safety, cleanliness, and expanding greenery, clarifying that the project contributes to connecting densely populated residential and commercial areas. It is part of an integrated comprehensive mass transit system that works in harmony with other transportation modes such as the metro and the light electric train. The project's objectives include reducing congestion, lowering fuel consumption, and encouraging the use of modern mass transit, while linking key intersections and major axes along the Ring Road.

Size: 120%Text Size

Notice: This Is an AI-Generated Summary

Display The Full Article
Share the News

Comments (0)

JARAYID.COM

Jarayid is your destination for lifestyle and cultural news, combining quality journalism, modern trends, and thoughtfully curated content to inform, inspire, and connect readers globally.

Download App Free!

Scan the QR Code

QR code

Follow Us

OUR PICKS

Tech thumbnail
Tech

Warner Bros. alleges Amazon poached executives

World News thumbnail
World News

Trump pauses Iran attack as Israel advances into Syria

Sports thumbnail
Sports

Ahmed Hegazi Departs Football in 2026

Categories

  • Podcast04
  • America445
  • Europe170
  • Health225
  • Shows71
  • Sports312
  • Tech302
  • World News452
  • Celebrity News122
  • Economy215
  • Terms & Conditions|
  • Privacy Policy|
  • About Us|
  • Contact Us|
  • Advertise With Us|
  • FAQ|
  • Archive

© 2026 Jarayid.com