بوابة أخبار اليوم
بوابة أخبار اليوم
Ready to play
Ready to play
The Yellow Mountain Wastewater Treatment Plant is the largest of its kind in the Middle East and the third largest in the world. It treats 2.5 million cubic meters of wastewater daily and produces 60% of the electricity it needs by treating sludge and generating methane gas. Its development and expansion process took 40 months and cost over 2 billion Egyptian pounds, aiming to increase its capacity to 3.5 million cubic meters per day, serving approximately 17.5 million people. The plant utilizes the latest treatment and methane-based power generation systems, is operated electronically through a control room, and plays a significant role in addressing water scarcity by reusing treated water for agriculture and sustainable growth.
Notice: This Is an AI-Generated Summary
Comments (0)