بوابة الشروق
بوابة الشروق
Ready to play
Ready to play
The article highlights the efforts of the Ministry of Petroleum in Egypt, led by Minister Karem Badawy, to maximize natural gas production through the application of the latest drilling and exploration technologies at the company's subsidiary site in Port Said, especially the Harmatan field in the Mediterranean Sea. Emphasis was placed on connecting the field to the Hapy station to accelerate production, with a focus on enhancing safety systems and maintaining stable gas supplies to the local market. The company successfully achieved its full production target for the fiscal year 2025/2026, with plans to increase output from other fields as a primary source of natural gas and condensates.
Notice: This Is an AI-Generated Summary
Comments (0)