بوابة أخبار اليوم
بوابة أخبار اليوم
Ready to play
Ready to play
The Egyptian Minister of Transport announced that the high-speed electric train network under construction extends for 2,250 kilometers and includes four lines, with the first three lines totaling 2,000 km completed. The first line, which runs from Suez to Marsa Matruh and is 660 km long, aims to connect the Red Sea and the Mediterranean, enhance transportation, and improve infrastructure. The pilot operation phase involves starting the segment without passengers, marking a significant leap forward in transportation methods, along with better coordination with other means of transport to strengthen Egypt's position as a regional logistics hub. The civil and industrial works for the project have been fully carried out by Egyptian industries, while trains and control systems were imported from abroad, as part of a plan to localize the transportation industry in Egypt.
Notice: This Is an AI-Generated Summary
Comments (0)