1 Day
Source:
صدى البلد
صدى البلد
Ready to play
Ready to play
The Qalyubia Governorate and Cairo Governorate have begun implementing the development project of the Amiriya Bridge, which was constructed in 1983 over the Ismailia Canal. The goal is to enhance its efficiency, strengthen its safety, and improve traffic flow between the two governorates. The redevelopment includes rehabilitating the structural elements, improving safety features, and expanding and strengthening safety measures, with a total cost of 152 million Egyptian pounds funded jointly by the two governorates. The project commenced on July 18, 2024. Its aims are to improve traffic flow, increase the bridge's lifespan, and reduce traffic congestion in the area.
Notice: This Is an AI-Generated Summary
Comments (0)