بوابة أخبار اليوم
بوابة أخبار اليوم
Ready to play
Ready to play
Qena University's report focused on monitoring the development of the university campus. It reviewed Dr. Ahmed Akawi's work on the construction of the "Alim Al-Hakim" mosque, which is being built at the main gate area to serve faculty members, staff, and students, with the aim of providing a suitable environment for religious practices. The report also examined the improvement and development work around the outer wall, which included installing interlock tiles, preparing parking lots, establishing rest areas and benches, as well as beautification and aesthetic enhancements to the entrances. These efforts are intended to boost circulation and visual clarity of the area. The university emphasized the importance of implementing these projects in accordance with an integrated vision to ensure optimal use of spaces, high-quality execution, and timely completion, all part of a plan to develop infrastructure and improve the environment for work and learning.
Notice: This Is an AI-Generated Summary
Comments (0)