بوابة الفجر
بوابة الفجر
Ready to play
Ready to play
The Minister of Housing, Engineer Randa El Menshawi, has directed urgent technical and operational measures to restore the full operation of the seawater desalination plant at kilometer 17 in Arish, following its exposure to unusual environmental effects, such as algae blooms and suspended materials. The plant had been temporarily shut down over two weeks ago as a precaution to protect the system components from damage. Since then, work has been ongoing to assess and review the plant's components, carry out cleaning and sterilization procedures, and gradually operate at about 50% of its current capacity (around 25,000 cubic meters per day). This aiming to compensate for the water deficit and stabilize supplies for citizens, in addition to continuous coordination to ensure water quality and safety. The relevant authorities emphasize the importance of the safety and security of the supplied water, along with supporting alternative sources and providing equipment and vehicles for water transport, to ensure service continuity during the repair processes.
Notice: This Is an AI-Generated Summary
Comments (0)