بوابة الشروق
بوابة الشروق
Ready to play
Ready to play
The article discussed the visit of the Egyptian Prime Minister, Mustafa Madbouly, to several mass transit projects in Cairo and Giza, aimed at developing infrastructure and reducing travel times. The visit included an overview of the Mono Rail Project on the West Nile, which is 86% complete, as well as the first phase of Line 4 of the metro, with a 65% completion rate. Additionally, the first line of the Electric Rapid Train was reviewed, which connects Ain Sukhna to Mersa Matruh over a length of 660 km, and includes four lines with a total length of nearly 2,250 km. The projects are intended to improve transportation and trade, and to reduce travel times between Cairo and Alexandria to an hour and 25 minutes, and between Cairo and Mersa Matruh to two and a half hours, with passengerless trial runs scheduled to begin in early 2027. These initiatives aim to attract investments and achieve a qualitative leap in transportation and logistics services.
Notice: This Is an AI-Generated Summary
Comments (0)