Ready to play
Ready to play
The trial operation of the general cargo and bulk station at the Suez Port has begun, receiving the vessel GAMBELLA, which carried approximately 1,460 tons of battery modules for the energy storage system. The aim of this process is to test the efficiency of the berths, equipment, and operational systems, as well as to measure the performance of the operations before moving to full-scale operation. The station covers an area of about 397,000 square meters and features two berths totaling 1,200 meters in length with a depth of 18 meters. It aims to handle 10 million tons annually to enhance the capabilities of Suez Port and support trade movement and industrial projects, as part of a development plan that strengthens Egypt’s position as a regional hub for transportation and logistics.
Notice: This Is an AI-Generated Summary
Comments (0)