المصري اليوم
المصري اليوم
Ready to play
Ready to play
The Monorail Project of West Nile in Egypt is preparing to begin trial operation. It is part of a broader plan to expand electric mass transit systems. Eight stations are scheduled to be operational in October 2026, spanning from New October to the Alexandria Desert Road. The trial operation of the remaining stations—from the Alexandria Desert Road to Wadi El Nil—is expected to start in the first quarter of 2027. Full operation is anticipated to be completed within the same quarter. The train line extends 43.8 kilometers and includes 13 stations, with a maximum speed of up to 80 km/h, aimed at reducing travel times and alleviating traffic congestion. The project connects residential areas, university campuses, and commercial districts, and is integrated with the metro network and electric trains. It also links several other modes of transportation, such as the metro and the first line of the rapid electric train.
Notice: This Is an AI-Generated Summary
Comments (0)