1 Day
Source:
مصراوي
مصراوي
Ready to play
Ready to play
Maintenance work is currently being carried out on the service road adjacent to the upper Etay El Baroud Bridge ramp on the agricultural road (Cairo–Alexandria) with the aim of removing damaged asphalt and improving the road's efficiency. The General Authority for Roads and Bridges announced that the damaged sections have already been removed and paving works have begun, with all measures taken to secure traffic flow and increase the visibility of guidance signs. These procedures are part of an ongoing maintenance plan to enhance safety and improve service levels across the road network.
Notice: This Is an AI-Generated Summary
Comments (0)