Ready to play
Ready to play
The second phase of the Bus Rapid Transit (BRT) project in Cairo has been announced to commence on September 26, 2026. The new phase includes 16 stations spanning up to 75 kilometers, connecting the Ain Sukhna Road with the Sun Capital Station. It aligns with the ministry’s plan to promote sustainable public transportation and reduce reliance on private vehicles. The stations feature integrated transit complexes and connect through multiple modes of transportation such as the metro and electric trains, aiming to improve traffic flow, shorten travel times, and enhance the environment by utilizing locally made electric buses. The second phase of the project is a significant step in accelerating and facilitating movement for citizens, linking vital areas and residential zones through an integrated network of modern transportation modes.
Notice: This Is an AI-Generated Summary
Comments (0)