14 Hrs
Source:
بوابة الشروق
بوابة الشروق
Ready to play
Ready to play
The National Oil Corporation of Libya announced the restart of crude oil production from the Sharara field after five days of suspension. The closure occurred when protesters from the Oil Facilities Guard shut down the transportation pipeline in the Hamada area. Joint efforts successfully reopened the main valve (No. 7), allowing oil pumping operations to resume gradually and systematically, with measures put in place to ensure safety and stability. The closure resulted in estimated losses of over $95 million and led to the shutdown of a refining unit at the Zawiya refinery, amid protesters' demands for higher salaries.
Notice: This Is an AI-Generated Summary
Comments (0)